Project Brief

Pembroke & Bull were appointed to undertake decoration works to 464 bedrooms, corridors, and lobby areas over 12 floors. Dulux Trade Ultra Matt was applied to areas with critical lighting to increase uniformity on low level ceilings.


The tough, hard-wearing formulation of Dulux Trade Diamond Eggshell was used to ensure high-traffic areas looked better for longer. It was applied to woodwork in corridors as well as the timber window surrounds in bedrooms.


Dulux Trade Super Grip Primer enabled existing metal suspended ceilings in corridors to be top coated with Charcoal Black Dulux Trade Vinyl Matt.


Scope of Works

Painting & Decorating works started on the 11th of Jan 2021 and comprised of decoration to the following areas:

· Decorate all corridor areas with Dulux trade paint and bespoke wallpaper to walls.

· Decorate all ceilings in bedrooms with Dulux Trade paint and install bespoke wallpapers to niches and headboard areas.


Key Challenges

The pandemic struck three months into this project, bringing it to a grinding halt. When work recommenced, the challenge was learning to adapt to the new way of safe working whilst keeping on programme. The outcome of this was seeing various trades coordinating works together to maintain safe working distances delivering the project in time for reopening.


Overall Output

The project was completed on time ready for guests once government restrictions eased.

The project featured on Dulux Trade Paint Expert website which can be found following the link below: Dulux Trade Case Study Hilton Doubletree Westminster (duluxtradepaintexpert.co.uk)