top of page
Search

The Bottle Factory


The Bottle Factory
.pdf
Download PDF • 11.88MB




Project Brief

Pembroke & Bull were appointed to undertake decoration works to The Bottle Factory SE1. The 126-year-old Factory offers a unique working environment full of volume and historic design features connecting to its industrial past featuring 32,234 sq. ft across three floors and an annex.


Scope of Works

Painting & Decorating works started on the 11th of Jan 2021 and comprised of decoration to the following areas:

· Spray finish to all internal and external UPVC windows using HVLP Spray Unit

· Decoration to ground floor, first floor and loft which previous use was the factory

· Decoration to the Annex which was previously used as the bottle house.

Key Challenges

The industrial features of the building provided a challenge to ensure the character of the building was preserved whilst installing decorative finishes as an update for its next intended use.

Diluted paint was specified to be used on bare brickwork ensuring the same consistency on each batch to provide a uniform finish.


Overall Output

The project was completed as per programme and within budget

The outstanding results of this project can be found at: https://youtu.be/761eWdrlR0I

63 views0 comments

Recent Posts

See All

Kommentare


bottom of page