top of page
Search

Handles Mansions WC1

Updated: Jan 17, 2022


Handles Mansions was one of our classic refurbishment projects. Fast paced with an eye for getting the 24 flats occupied ready for new students it was initially a straight forward programme. The scope of works ranged from redecorating 24 flats including all external elements to application of intumescent coatings to new steelwork throughout the realms of the building. The challenge on this project was a sudden change to fire strategy to the building which in turn caused extensive delays with closing up ceilings. With this in mind, our company reacted with high volumes of well organised labour when areas became available resulting in bringing the project back on programme through to completion. Completion of this project on time resulted in the acquis

ition of a 4 year contract for the main contractor.



80 views0 comments

Recent Posts

See All

Kommentare


bottom of page